|
|
|
|
 |
|
 |
|

Many tools are used to verify that equipment installed are tested even before they are connected to the main system. Cables have to be verified that they are crimped properly and passed at least basic transmission tests.
Labeling of equipment and cables are another important aspect of our installers' job. When done properly, future maintenance work (mainly troubleshooting) would be made easier.
Some of the images showed jobs which were completed. Some showed work-in-progress. Some, obviously were still in raw-form when the photos were taken! Let's see what else we have in our archive!

|
 |
|
 |